Package 2b: Metro Manila Urban Transport Integration Project, Package 2B : EDSA LRT Line 3 Corridor (Mainline), EDSA (from Roxas Blvd. To Balintawak)

Package 2b: Metro Manila Urban Transport Integration Project, Package 2B : EDSA LRT Line 3 Corridor (Mainline), EDSA (from Roxas Blvd. To Balintawak)

EDSA (from Roxas Blvd. to Balintawak)
Metropolitan Manila Development Authority
November 15, 2007
May 7, 2009
Completed

Construction of six (6) footbridges with a total length of 787.38 meters, one (1) elevated walkway, loading and unloading bays, pedestrian steel railings/see-through fence, gantry structures, and sidewalk/geometric improvements.