[Completed] Irrigation
IRRIGATION, PUMPING STATION AND DRAINAGE CANAL
CONSTRUCTION PROJECTS
Construction of Super Diversion Canal (SDC) from Sta. 50+540 to Sta. 51+850, Laterals “U” & “V” and Sub-Laterals including Related Structures and Supply, Installation, and Commissioning of Steel Gates
Type of Work: Construction of Super Diversion Canal (SDC) of 1,310 meters irrigation canal and sub-laterals canal of 36,795 meter with a total of 38,105 meter irrigation canal, includes related structures and supply, delivery, installation and commissioning of steel gates. Embankment of 414,425 cubic meter
Owner: National Irrigation Administration (NIA)
Date Started: June 09, 2015
Completion Date: December 13, 2016
Maris Dam Optimization Project Modification of Stop Log Guide Slot
Type of Work: Replacement of Stationary Sealing & Roller Path, Bottom Sill Modification.
Owner: SN Aboitiz Power / National Irrigation Administration
Date Started: March 20, 2015
Completion Date: December 15, 2015
Construction of Agno River Flood Control Project, Phase II, Package III - Social Development for Poponto Retarding Basin, Tarlac and Pangasinan
Type of Work: Road heightening, construction of dikes, construction of twenty two (22) units evacuation centers and drainage channel excavation.
Owner: Department of Public Works and Highways (DPWH)
Date Started: March 21, 2002
Completion Date: November 25, 2004
Pampanga Delta Development Irrigation Comp. (PDDP-IC) Contract Package No. PDDPI-C-2 (Schedule I), Arayat, Pampanga
Type of Work: Construction of Irrigation and drainage canals, settling basin, pumping station and steel gates / slide gates, and installation of pumping equipment
Owner: National Irrigation Administration (NIA)
Date Started: December 14, 1999
Completion Date: May 15, 2003
Lower Agusan Dev't. Project Contract Package I, Contract No. LADPI-C-I Irrigation Component for Bit-Os & Aupagan Pumping Station, Agusan del Norte
Type of Work: Irrigation, flood control, electrical and mechanical works & construction of pumping station.
Owner: National Irrigation Administration (NIA)
Date Started: December 01, 1998
Completion Date: August 31, 2001
Pampanga Delta Development Project (Flood Control Component) Phase I, Contract Package IV, Masantol, Pampanga
Type of Work: Widening, dredging and dike construction along the river sluice gate & other related structures, flood control
Owner: Department of Public Works and Highways (DPWH)
Date Started: July 28, 1993
Completion Date: February 04, 2002