[Completed] Site Development & Building Construction

 

 

Clearing, Grubbing, Excavation and Backfill of the 80,000 TPA Del Pilar Steel  Rolling Mill Project Site Plaridel, Bulacan

Type of Work: Embankment, Land Development, Removal of vegetation and Backfilling 

Owner: Del Pilar Steel Manufacturing Corporation

Date Started: February 18, 2014

Completion Date: June 18, 2014

 

 

Hotel Masfino Incorporated, San Rafael, Bulacan

Type of Work: Construction of Hotel Masfino (20 rooms) 

Owner: C.M. Pancho Construction Inc. (CMPCI)

Date Started: December 01, 2009

Completion Date: July 30, 2010

 

 

Earthmoving Works at Rio Tuba Nickel Mining  Corp., Bataraza, Palawan

Type of Work: Complete supply of labor, materials, equipment, tools, consumables and technical supervision necessary for the excavation, loading, hauling and stockpiling of two million cubic meters of limonite materials 

Owner: Coral Bay Nickel Corporation

Date Started: October 21, 2008

Completion Date: June 18, 2009

 

 

Royal Northwoods Residential Estate Subdivision, San Rafael, Bulacan

Type of Work: Construction of minor & major roads and drainage system

Owner: Northwoods Realty and Development Corporation (NRDC)

Date Started: January 05, 2006

Completion Date: May 30, 2008

 

 

Construction of the Royal Northwoods Golf Course Clubhouse, San Rafael, Bulacan

Type of Work: Construction of Club House, Tee House and Control Room

Owner: Northwoods Realty and Development Corporation (NRDC)

Date Started: May 2003

Completion Date: May 2004

 

 

Royal Northwoods Golf Course & Country Club, San Rafael, Bulacan

Type of Work: Construction of irrigation and drainage canal system, roadways, site development including the completion of the first eighteen-hole golf course.

Owner: Northwoods Realty and Development Corporation (NRDC)

Date Started: November 13, 1996

Completion Date: September 29, 2003

 

 

Construction of Burgos and Cauayan Pumping station 1 & 2, Building Magat River Multi-Purpose Project, Isabela

Type of Work: Dam and Multi-purpose project including installation of three (3) units vertical mixed flow pumps 800 mmø and five (5) units vertical fixed flow pumps 1350 mmø motor control center, substation equipment & appurtenances

Owner: National Irrigation Administration (NIA)

Date Started: July 1983

Completion Date: September 1984 