Construction of two (2) additional lanes, 19.74km of PCCP and Bridge Construction
New Construction of Roads (L=16.430 km.), Construction of / Rehabilitation of three (3) bridges
Complete supply of labor, materials, equipment, tools, consumables, and technical supervision necessary for the excavation, loading, hauling and stockpiling of two million cubic meters (2,000,000 cu.m.) of limonite materials
Pipelaying works of 2000mm diameter SP with the total Length of 812 lm. with road restoration
Construction of six (6) footbridges with a total length of 787.38 meters, one (1) elevated walkway, loading and unloading bays, pedestrian steel railings/see-through fence, gantry structures, and sidewalk/geometric improvements.
Bridge Construction and Installation of Superstructure Steel Girder
Construction of Bridge with bored pile, installation of WBPI modular steel bridge superstructure, drainage and slope protection structures & construction of appurtenant structures
Construction PCCP with asphalt concrete overlay, rehabilitation and repair of twenty two (22) bridges, construction of RCBC and drainage structures
Construction of five (5) bridges with a total length of 1,060 m; with 29 km PCCP, drainage structures and slope protection
Construction of bridge and approaches with concrete pile cast-in drilled holes (Bored Piled)