Arterial Road Bypass Project, (Plaridel Bypass) Phase III, Contract Packages 1 & 2, KO0034+900.00 to KO0047+400.00, JICA LOAN NO. PH-P266

Arterial Road Bypass Project, (Plaridel Bypass) Phase III, Contract Packages 1 & 2, KO0034+900.00 to KO0047+400.00, JICA LOAN NO. PH-P266

Plaridel, Bulacan
Department of Public Works and Highways
February 24, 2021
September 17, 2024
Completed

Construction of 12.2km additional two (2) lanes to make a two (2) directional – 2-lane road which includes the extension of cross drainage facilities, duplication of the design of the existing seven (7) bridges and design of a 285m Flyover