Arterial Road Bypass Project, (Plaridel Bypass) Phase III, Contract Packages 1 & 2, KO0034+900.00 to KO0047+400.00, JICA LOAN NO. PH-P266
Arterial Road Bypass Project, (Plaridel Bypass) Phase III, Contract Packages 1 & 2, KO0034+900.00 to KO0047+400.00, JICA LOAN NO. PH-P266
Location
Plaridel, Bulacan
Owner
Department of Public Works and Highways
Start Date
February 24, 2021
Completion Date
September 17, 2024
Status
Completed
Construction of 12.2km additional two (2) lanes to make a two (2) directional – 2-lane road which includes the extension of cross drainage facilities, duplication of the design of the existing seven (7) bridges and design of a 285m Flyover