Package 2b: Metro Manila Urban Transport Integration Project, Package 2B : EDSA LRT Line 3 Corridor (Mainline), EDSA (from Roxas Blvd. To Balintawak)
Package 2b: Metro Manila Urban Transport Integration Project, Package 2B : EDSA LRT Line 3 Corridor (Mainline), EDSA (from Roxas Blvd. To Balintawak)
Location
EDSA (from Roxas Blvd. to Balintawak)
Owner
Metropolitan Manila Development Authority
Start Date
November 15, 2007
Completion Date
May 7, 2009
Status
Completed
Construction of six (6) footbridges with a total length of 787.38 meters, one (1) elevated walkway, loading and unloading bays, pedestrian steel railings/see-through fence, gantry structures, and sidewalk/geometric improvements.